top of page


Viridian Nearly Complete
Viridian Leasing is Nearly Complete! Our long awaited Viridian Leasing Office is finally finishing up this week. The Grand Opening will take place this weekend. The rain has slowed construction down a little bit. However, we were able to capture a few photos during our punch list review. Exterior Exterior View of Viridian Leasing Office In September of 2015, we were asked to renovated the Leasing Center and Clubhouse at the Conservatory at Druid Hills. The new design struck
Jun 12, 2017


Viridian Leasing Office Construction Update
Viridian Leasing Center Is Now Under Construction! Check out our progress below of the Viridian Leasing Center. Viridian Clubhouse Renovation The Viridian Leasing Center is under construction and moving at a good pace. The initial design for the building was completed in December of 2015. Then, construction began at the end of this April. The structure and most of the TPO roofing is complete. Installed framing and clerestory. Viridian layered heights and spaces. Cooper Pierce
Dec 20, 2016


Rebranding A Leasing Center
Rebranding a Leasing Center Back in September 2015, Jones Pierce Studios was asked to renovate the leasing center and the clubhouse at the Conservatory at Druid Hills. The new design became a modern rebranding of the existing structure. It contains flat roofs and significantly more and more modern styled windows. The leasing center’s design plays with varying heights and volumes of spaces. This gives a layered effect to the building and maximizing sunlight. The new design str
Jul 22, 2016
bottom of page